SCOPE OF WORK

The service provide the services to hirer as per the scope of work as described in Annexes 1 to 3.

ANNEXURE-1

IMPLEMENTATION SCOPE – (BTS + MINILINK)

1.       SCOPE

This work consist of implementation of one BTS site and one MINILINK hop.

2.       JOB CONTENT

·       Receiving equipment and unpacking at site.

·       installation of BTS equipment-indoor as per installation documents.

·       installation of BTS equipment-outdoor as per installation documents.

·       feeders jumpers connectorisation as per standards.

·       clamping and earthing fixing etc. as per standards.

·       GSM antenna installation as per installation documents.

·       compete GSM equipment installation, leading to commissioning of one RBS site.

·       Installation of microwave equipment indoor as per site documents.

·       Installation of outdoor radio antenna as per installation documents.

·       Complete installation of microwave equipment on both sides of the hop, leading to commissioning of one hop of microwave link.

·       Standard installation tools one set per team/site to be available.

·       Antenna feeders test and test reports.

ANNEXURE – 2

IMPLEMENTATION SCOPE – (BTS)

1.       SCOPE

This work consists of implementation of one BTS site

2.       JOB CONTENT

As per Annex 1 with the exception of Microwave equipment.

ANNEXURE – 3

IMPLEMENTATION SCOPE – (BTS)

1.       SCOPE

This work consists of implementation of one Minilink site. 

2.       JOB CONTENT

As per Annex 1 with the exception of RBS/BTS equipment.